When you buy with our links, we may earn a commission. See how we work with brands

Vesgantti Review

Derek Hales

Updated

Vesgantti Hero Image
7.12 Overall Score
Tested With Scoring System 1.3
7.0 Cooling
9.0 Motion Transfer
8.4 Response Time
6.6 Edge Support
8.2 Sex
4.0 Pressure Relief
6.9 Off-Gassing
9.0 Company

Best For

  • Low price, under $300 for a queen mattress
  • Motion transfer is surprisingly low
  • Material responsiveness is reasonably fast

Considerations

  • Terrible pressure relief, one of the most uncomfortable mattresses I’ve tested to date
  • Longer off-gassing than average (11 days)
  • Edge support is incredibly disappointing while lying

Our Verdict

The Vesgantti is an 11.5″ coil mattress that is primarily made of pocketed coils, topped with a thin 1.0″ poly foam and 1.0″ quilted cover. It has a very traditional design that leaves something to be desired in terms of pressure relief and just comfort in general.

This mattress is available in a single firmness, 6 out of 10, which gives the mattress a medium-firm feel.

The Vesgantti has moderate sinkage and high levels of bounce. More bounce is pretty typical for coil mattresses as the spring foundation really gives the mattress a high level of energy and pushback.

In our performance tests, this mattress earned an overall score of only 7.12, ranking in the bottom 3% of all mattresses tested to date.

The advantage of this mattress is certainly the price, costing only $284 for a queen mattress, 70% less than average. But at the end of the day, you get what you pay for and the Vesgantti will leave you with many performance pitfalls in exchange for the low price.

Type: Coil
Firmness: Medium-Firm (6)
Best For: None

In This Review
Performance Tests | Firmness | Support & Sleeping Positions | Design | Materials | Comparisons | FAQs

Performance Tests

At NapLab, we put each mattress to the test.

We test 10 different factors that impact the performance, comfort, and feel of the mattress. We then take the results of that test and compare to every mattress we’ve tested to date.

Check out the full performance table below to see how this mattress ranks:

FactorVesganttiAverage
Overall Score7.128.55
Price (Queen)$285$942 (Coil only)
Cooling – Score7.08.6
Sinkage – Depth2.12″2.16″
Sinkage – FeelModerateModerate
Motion Transfer – Score9.08.2
Motion Transfer – Acceleration7.27 m/s²8.74 m/s²
Response Time – Score8.48.8
Response Time – Mostly Recovered0.4 sec.0.4 sec.
Response Time – Fully Recovered1.1 sec.1.0 sec.
Bounce – Height10.33″9.27″
Bounce – FeelHighModerate
Edge Support – Score6.68.6
Edge Support – Sitting4.50″4.04″
Edge Support – LyingPoorGood
Sex – Score8.28.3
Pressure Relief – Score4.08.6
Comfort Layer Thickness2.0″4.2″
Mattress Thickness11.5″12.1″
Off-Gassing – Score6.98.2
Off-Gassing – SmellStrongStrong
Off-Gassing – Days11 days6 days
Company – Score9.08.8
Trial100 nights179 nights
Warranty10 years25% have lifetime warranties, average of other 75% of mattresses is 13 years

How is Vesgantti Different?

The Vesgantti is a coil mattress with a below-average performance score, but also a price tag that is significantly below average as well. The result is essentially a cheap, low-performing mattress.

Advantages

This mattress has numerous issues but does excel in a few key areas. First, the price tag is very low. A queen mattress is only $285, 70% less expensive than the average mattress. It also has fantastic cooling performance. Response time and edge support are also above average as well.

Neutral Factors

This mattress has moderate sinkage and high levels of bounce. The result is a mattress with a bouncy, yet restrained feel.

Disadvantages

Areas that struggle include higher levels of motion transfer (17% more than average) and slower off-gassing as well.

Vesgantti Relaxing
Vesgantti Relaxing

Upon unboxing, this mattress took 11 nights for all odor to fully dissipate. For reference, the average is 6 days so this is quite a bit slower than average.

The other area where the Vesgantti really struggled is pressure relief. This mattress has a 2.0″ comfort layer, which is 2.2″ thinner than average, and also a thinner overall profile (11.5″ compared to the average of 12.1″).

The limited comfort layer and quality of the materials create a mattress that simply isn’t particularly comfortable.

7.0

Cooling Test

The Vesgantti has fair cooling. During our tests, I felt a moderate level of heat retention around my body.

Baseline Temp.

76.3° F

Max Temp.

90.9° F

Ending Temp.

81.9° F

Some isolated parts of my body, especially under my mid-back, I felt a level of heat retention I would describe as “hot”. However, this was more isolated, with the bulk of the mattress just feeling warm.

Max Temp.

Vesgantti Before Cooling Test
Vesgantti Before Cooling Test

Ending Temp

Vesgantti After Cooling Test
Vesgantti After Cooling Test
  • Baseline Temperature – the temperature of the mattress before anyone lies on it
  • Maximum Temperature (0 minute) – the temperature of the mattress after lying on it for 15 minutes
  • Ending Temperature (5 minute) – the temperature of the mattress after being lied upon and having no one on it for 5 minutes

When we consider the material design this is a pretty basic mattress. We have 2.0” of comfort material sitting atop a 9.5” coil unit. Having less foam in the mattress definitely helps to reduce heat retention, as there is simply less material that heat could be easily trapped within.

Even so, the foam comfort layers don’t seem to breathe particularly well and I could notably feel the trapped heat around my body.

In our objective temperature tests, we measured a max surface level temperature of 90.9° F. This is 1.1° more than the average of 89.8° F, based on all of our tests to date.

Heat Dissipation Over Time

Vesgantti V 1 3 Heat Dissipation Chart 1

When we consider the combination of objective data, my subjective experiences, and an analysis of the materials, I’m confident in my view that cooling is fair.

Sinkage Test

The Vesgantti has moderate sinkage. During our tests, we measured a pressure point sinkage depth of 2.12″. This is 0.04″ less sinkage than the average sinkage depth of 2.16″, based on all of our tests to date.

Sinkage Depth

2.12″

Sinkage Feel

Moderate

Body Contour

Balanced

The level of sinkage is documented in the image below.

Vesgantti Sinkage Test
Vesgantti Sinkage Test

The mattress creates a more traditional type of coil feel. While Vesgantti calls this a hybrid, it contains so little foam that I believe this mattress is closer to the coil mattress type than it is a hybrid.

The material construction is just 2.0” of comfort material (1.0” of which is the quilted cover) on top of 9.5” of coil springs. As a result, the substantial feel of the mattress is the metal springs.

Those springs do not create a notable hug around the body. Ultimately, this mattress creates a more traditional coil and spring type of a feel.  To be comfortable on this mattress you’ll need to prefer that coil feel and be okay with less hug and less body contour.

9.0

Motion Transfer Test

The Vesgantti has a very low level of motion transfer. During our tests, we measured a total acceleration range of 7.27 m/s². This is 17% less motion transfer than the average of 8.74 m/s².

Accel. Range

7.27 m/s²

Motion Duration

1.04 seconds

I was surprised by the low level of motion. Typically, mattresses with less foam and a tall spring coil unit will have a higher level of motion. Seemingly, the coil unit is doing a nice job at isolating movement between coils.

The level of motion transfer is also documented in the video below.

In our motion transfer chart, which visualizes our accelerometer data, we can see the highest motion peaks from 0 to 0.14 seconds.

We see a smaller secondary spike from 0.50 to 0.72 seconds and it’s not until 1.04 seconds that we return to near-zero levels of energy.

Motion Transfer Over Time

Vesgantti V 1 3 Motion Transfer Chart 1

While I was pleased with the relatively low level of motion intensity, the longer-than-average motion duration is far from ideal. Even so, considering the price point and motion peaks it’s hard to complain too much. 

8.4

Response Test

The Vesgantti is a mixed bag for material responsiveness, with a fast mostly recovered response time and a moderate fully recovered response time.

Mostly Recovered

0.4 sec.

Complete Recovery

1.1 sec.

In our mostly recovered test, we measured a recovery speed of 0.4 seconds, which is 0.03 seconds faster than the average of 0.43 seconds, based on all of our tests to date.

In our fully recovered responsiveness test, we measured a recovery speed of 1.1 seconds, which is 0.12 seconds slower than the average of 0.98 seconds.

The level of responsiveness is documented in the video below.

On the positive side, the bulk of the mattress is able to rebound back to shape incredibly quickly. This makes perfect sense, given that 9.5” of the total 11.5” design is a metal spring unit.

These metal coils rebound back to shape effectively instantly. The 2.0” comfort layer takes a moment or two to fully recover to its original shape.

Certainly, we would have liked to have seen the response time be closer to or better than average, but at 1.1 seconds to recover it’s not excessively slow to fully recover. All things considered, I don’t expect this responsiveness will be an issue for most sleepers.

Bounce Test

The Vesgantti has a high level of bounce. During our tests, we measured a total bounce height of 10.33″. This is 1.06″ more bounce than the average of 9.27″, based on all of our tests to date.

Max. Depth

4.91″

Max. Rebound

5.42″

Total Bounce

10.33″

Max. Sinkage Depth

Vesgantti Bounce Depth
Vesgantti Bounce Depth

Max Bounce Height

Vesgantti Bounce Rebound
Vesgantti Bounce Rebound

Typically, coil mattresses have a higher-than-average level of bounce and that’s exactly what we measured with the Vesgantti. The 9.5” coil unit rebounds ample bounce.

The level of bounce is also documented in the video below.

In addition, having a thinner-than-average comfort layer is also aiding in the higher bounce. The higher bounce is greatly beneficial for sex and ease of movement. However, it’s also the reason that we measured a longer-than-average motion duration.

6.6

Edge Support Test

The Vesgantti has good sitting edge support and poor lying edge support.

Max. Sinkage

4.50″

Lying Support

Poor

Reinforced Edge

No

In our sitting edge support test, we measured a sitting sinkage compression of 4.50″. This is 0.46″ more sitting sinkage than the average of 4.04″, based on all of our tests to date.

The level of edge support while seated is documented in the images below.

Sitting, 140 lbs.

Vesgantti Edge Support Test
Vesgantti Edge Support Test

Sitting, 200 lbs.

Vesgantti Edge Support With Vest
Vesgantti Edge Support With Vest

While sitting directly on the edge, the mattress did a surprisingly good job at maintaining its shape and providing good support.

While sitting edge support was good, lying edge support left much to be desired. While lying directly on the edge of the mattress, I felt that the support was poor in all sleeping positions.

The level of edge support while lying is documented in the images below.

Lying on Edge, 140 lbs.

Vesgantti Edge Support Back Sleeping
Vesgantti Edge Support Back Sleeping

Lying on Edge, 200 lbs.

Vesgantti Edge Support Back Sleeping With Vest
Vesgantti Edge Support Back Sleeping With Vest

When my body was within even several inches of the edge there was a notable compression of materials, especially under my midsection. The mattress contains no edge support foam and no reinforced edge support coils.

When you couple this fact with the limited 2.0” comfort layer (and those foams being lower quality), you simply have no substantial materials that are capable of supporting sleepers at the edge.

Overall, I found lying edge support to be incredibly disappointing, even so, sitting edge support was still reasonably good.

8.2

Sex Test

The Vesgantti has good sex performance. On the positive side, bounce is high and sitting edge support is good. Bounce and edge support are by far the two most critical factors for good bounce.

Sex FactorFactor WeightScoreRating
Bounce65%8.9High
Edge Support20%8.1Good
Noise5%4.0Very high
Pressure Relief5%4.0Terrible
Cooling5%7.0Fair

Mattresses that perform well in these two categories can earn a good score, even if performance elsewhere is subpar. Ultimately, that is exactly what we measured with the Vesgantti.

Vesgantti Edge Sitting
Vesgantti Edge Sitting

On the negative side, noise was very high, pressure relief was terrible, and cooling was only fair. All of these sex performance categories earned below-average scores.

Even so, the higher-than-average bounce and good enough edge support helped the Vesgantti earn a good score overall for sex.

4.0

Pressure Relief Test

The Vesgantti has a terrible level of pressure relief. During our tests, I felt excessive pressure points across my body. The mattress only contains 2.0” of comfort materials, with 1.0” of that being within the quilted cover.

Comfort Layer

2.0″

Support Layer

9.5″

The Vesgantti has 2.15″ less comfort material than the average comfort layer thickness of 4.15″, based on all of our tests to date. Needless to say, having a comfort layer that is less than average isn’t great.

More distressing though is the quality of the foam layers. These comfort foams are among the worst I have ever seen in a mattress. The feel, the sound, the comfort, the pressure relief, everything about these foams is lacking. Everything about these foams screams poor performance and low quality.

Vesgantti Sinkage
Vesgantti Sinkage

The performance level on day 1 was quite frankly, awful. Even so, given their relative quality, I also am incredibly concerned about foam longevity. This type of foam simply is not going to hold up and will get notably worse over time.

When I consider our objective pressure mapping tests, material thickness, material quality, and my subjective experience on the mattress, I’m confident most sleepers will find the pressure relief to be terrible.

Pressure Map – Side Sleepers

Vesgantti Pressure Map Side
Vesgantti Pressure Map Side
Pressure Relief (PSI)AverageMaximum
Side Sleepers0.150.97

Pressure Map – Back Sleepers

Vesgantti Pressure Map Back
Vesgantti Pressure Map Back
Pressure Relief (PSI)AverageMaximum
Back Sleepers0.080.91

Pressure Map – Stomach Sleepers

Vesgantti Pressure Map Stomach
Vesgantti Pressure Map Stomach
Pressure Relief (PSI)AverageMaximum
Stomach Sleepers0.100.85
6.9

Off-Gassing Test

The Vesgantti had a strong smell upon the initial unboxing. The mattress smelled for 11 days. This is 4.6 days more than the average of smell duration of 6.4 days.

Initial Smell Strength

Strong

Off-Gassing Period

11 days

If you’re sensitive to strong odors, this could be an issue. The good news is that off-gassing is a one-time process and, once complete, should not affect the mattress long-term.

Vesgantti Tag
Vesgantti Tag
9.0

Company

The Vesgantti mattress comes with a 100-night trial period and a 10-year warranty. Shipping and returns are both free.

Company FactorFactor WeightScoreData
Returns40%10$0
Trial Period30%8.0100 nights
Warranty20%8.010 years
Shipping10%10$0
Country of Origin0%China

Compared to the average trial (179 nights), this is significantly shorter. The warranty is also shorter—the average warranty is 13 years, excluding 1 in 4 mattresses that offer lifetime warranties.

How firm is the Vesgantti?

The Vesgantti mattress comes in a single firmness, 6 out of 10, with a medium-firm feel.

Firmness Chart 6

This firmness would generally be suitable for a wide range of sleepers, but as our tests document above, there are a series of performance issues that make this mattress unsuitable for many sleepers.

Support & Sleeping Positions

Support on the Vesgantti is terrible. During our tests, I felt that the mattress did not create sufficient support or comfort for my body.

Support FactorData
Comfort Layer 2.0″
Support Layer 9.5″
Firmness Medium-Firm
Body Contour Balanced
Zoned Support No
Reinforced Edge No

The mattress is equipped with a 9.5″ support layer. This is 1.62″ thicker than the average support layer thickness of 7.88″, based on all of our tests to date. While it’s great to see a support layer that is thicker than average, that’s not the full story.

The quality of the coil unit, as well as the quality of the foam layers, is also important. As we discussed in the pressure relief section, pressure relief performance was terrible. The foams simply provide no substantial level of pressure relief or comfort.

Vesgantti Edge Support Side Sleeping
Vesgantti Edge Support Side Sleeping

As a result, it is functionally as if you are lying directly on the spring unit itself. Suffice it to say, lying so close to a metal spring coil unit does not feel great on the body and does not create great support.

For a mattress to be comfortable it needs to allow the sleepers to lie in the same position without experiencing undue pressure points. The Vesgantti simply failed to achieve that requirement.

Vesgantti Corner
Vesgantti Corner

As a result, I was unable to lie comfortably in the same position for any extended period of time. The lack of support on the Vesgantti is as much to do with the lack of pressure relief and comfort as it is a lack of material quality and performance with respect to the 9.5” support layer.

Check out the table below to see the sleeper weights and sleeping positions that would be best suited for this mattress.

Sleeper WeightStomach SleepersSide SleepersBack Sleepers
Under 150 lbs.NoNoNo
150-250 lbs.NoNoNo
250-300 lbs.NoNoNo

Based on all of my tests to date, an analysis of the materials, and my subjective experiences, I’m confident most sleepers will find support on the Vesgantti is terrible. This is one of the worst support experiences on a mattress I have tested in my career.

Design

The Vesgantti is an 11.5″ coil mattress with a medium-firm feel (6 out of 10). It is designed as an extremely budget-friendly mattress with a traditional coil feel and a price that is 30% below average.

Design FactorData
Type Coil
Thickness 11.5″
Cover Type Quilted
Weight 87 lbs.
Has Handles Yes
Fiberglass-Free Yes
Ships in a Box Yes

To hit this low price, this mattress cuts a number of corners. It has below-average performance in 4 out of 8 performance tests and a significantly thinner comfort layer (only 2.0″ thick, the average is 4.2″).

Vesgantti 4
Vesgantti

Materials

There are only three layers that make up the total 11.5″ thickness of this mattress. From top to bottom, we see the following layers:

Layer TypeThicknessManufacturer’s Specs Tested Specs
Quilted Cover1.00″Not AvailableNot Available
Poly Foam1.00″Not AvailableNot Available
Pocketed Coils9.50″Not AvailableNot Available
Vesgantti Material Layers
Vesgantti Material Layers

The Law Tag outlines the full breakdown of materials included in this mattress.

  • Materials
    • Outer Cover
      • 100% polyester
  • Size
    • Queen

The Vesgantti has an unusual law tag that seemingly does not comply with US law. The mattress law tag did not include where it’s made or the specific material components of the mattress internals, both of which are required to be included on the law tag.

The Cover

The Vesgantti mattress has a thin knit cover with a quilted design. It has moderate sinkage and great breathability (cooling score was 10/10).

Vesgantti Cover Close 2
Vesgantti Cover Close

There are also carrying handles on each of the long sides of the mattress. This can make it easier to rotate or transport the mattress.

The Comfort Layer

Beneath the cover is the comfort layer, which is made of a 1.0″ poly foam layer. This is incredibly thin and is a huge contributing factor to the poor pressure relief from this mattress.

Vesgantti Measuring Top Layers
Vesgantti Measuring Top Layers

The Support Layer

The support layer is made exclusively from pocketed coils. At 9.5″, these coils make up 82.6% of the total thickness of the mattress.

Vesgantti Materials
Vesgantti Materials

Product Evolution

The exact date that the Vesgantti coil mattress was released is a bit unclear. But there are thousands of reviews on this mattress, dating back to 2018 and possibly beyond.

Its overall design appears to be basically the same as it relies on a more traditional design and feel.

Other Mattresses to Consider

Not sure if the Vesgantti is the right pick for you? Check out these three other top-rated budget mattresses for under $500 you may want to consider.

For Memory Foam

Siena Material Layers

Siena

Ultra-Low Motion Transfer

The Siena is a 10″ memory foam mattress. It has a 4.5″ comfort layer and significantly better performance. Most notably, the Siena has great pressure relief and ultra-low motion transfer. As an added bonus, the Siena is only $399 for a queen mattress, making it a fantastic budget pick.

Read Review

For Low Bounce

Brooklyn Bedding Copperflex Material Layers

Brooklyn Bedding CopperFlex

13″ Memory Foam Mattress

The CopperFlex by Brooklyn Bedding is a 13″ memory foam mattress definitely worth considering. This mattress has moderate sinkage and very low levels of bounce. While lower bounce can be detrimental to intimacy, it has great pressure relief, among other factors.

Read Review

For Hybrid

Sweetnight Twilight Material Layers

SweetNight Twilight

High Bounce & Moderate Sinkage

The SweetNight Twilight is a 12″ hybrid mattress that is extremely budget-friendly, only $429 for a queen mattress. It has moderate sinkage and high bounce with a comfort layer of memory foam and poly foam. For a balanced hybrid, at an ultra-low price, the Twilight could be a good option.

Read Review

Frequently Asked Questions

Still have questions? Check out some of the top FAQs on the Vesgantti mattress below and get the answers you’re looking for.

How much does a Vesgantti mattress cost?

Here are the current prices, with any sales or promotions reflected below:

Twin: $229
Twin XL: $239
Full: $265
Queen: $284
King: $332
Cal. King: N/A

*Note: Sales prices are subject to change without notice or warning.

About Derek Hales

Derek Hales

Derek Hales is the Founder and Editor-in-Chief of NapLab. His insights and work has been featured on ABC's Tamron Hall Show, Freakonomics, CBS News, ESPN, Reader's Digest, Homes & Gardens, New York Post, CNET, & more. Derek has personally tested 580+ mattresses and began testing mattresses in 2014.

Popular Reviews & Guides